Categories

>

States

>

Plateau

search
Not Started
Eyemark

Completion Of Additional Wards (Amenity)

Total Project Cost

₦460.00M

STATE

PLATEAU

Ongoing
Eyemark

Completion Of Microbiology Laboratory

Total Project Cost

₦239.50M

STATE

PLATEAU

Ongoing
Eyemark

Construction Of Block 26 (Inner Ring Segment). Faculty Of Environmental Sciences At Naraguta Campus.

Total Project Cost

₦106.60M

STATE

PLATEAU

Not Started
Eyemark

Purchase Of 1 Nos Toyota Hilux For Board Chairman And 1 Nos Jeep For College Provost/Ceo Official Engagement

Total Project Cost

₦76.05M

STATE

PLATEAU

Not Started
Eyemark

Procurement Of 3Nos Project Vehicles For Emerging And Re-Emerging Diseases

Total Project Cost

₦65.00M

STATE

PLATEAU

Not Started
Eyemark

Construction Of Block Of Class Rooms In The College

Total Project Cost

₦60.00M

STATE

PLATEAU

Not Started
Eyemark

Procurement/Installation Of Teaching And Research Equipment And Training For The Civil Engineering Department.

Total Project Cost

₦45.85M

STATE

PLATEAU

Ongoing
Eyemark

Procurement/Installation Of Teaching And Research Equipment Training For The Department Of Mechanical Engineering.

Total Project Cost

₦44.74M

STATE

PLATEAU

Ongoing
Eyemark

Procurement/Installation Of Teaching And Research Equipment And Training For The Department Of Electrical Electronic (Power And Machine Laboratory)

Total Project Cost

₦44.50M

STATE

PLATEAU

Not Started
Eyemark

Construction Of Storey Building Of 4 Classrooms/Offices For Lecture/Lecturers.

Total Project Cost

₦20.00M

STATE

PLATEAU

Not Started
Eyemark

Perimeter Fencing Of The College

Total Project Cost

₦12.98M

STATE

PLATEAU

Not Started
Eyemark

Expanded Midwives Service Scheme For North Central Zone (Benue, Kogi, Kwara, Nasarawa, Niger, Plateau, Fct)

Total Project Cost

_

STATE

NASARAWA...

Not Started
Eyemark

Construction Of Dengi-Kwalmiya-Gagdi-Wawus S/B Bauchi Road In Plateau State.

Total Project Cost

_

STATE

BAUCHI...

Ongoing
Eyemark

Limited Rehabilitation Along Shendam - Yelwa- Ibi Road To Taraba State Border Ch65+000-Ch75+000; Limited Rehabilitation Of Otukpo-Ogobia - Onyangede Road In Benue State; Limited Rehabilitation Of Kontagora - Makera - Tegina Road Section Ii; Limited …

Total Project Cost

_

STATE

PLATEAU...

Not Started
Eyemark

Construction Of 32Nos Blocks Of 3 Classrooms At Calabar Municipal/ Odukpani Fed. Constituency(3Nos), Lavun/Mokwa/Edati Fed. Constituency(1No), Orumba N/S Fed. Constituency(1No), Udi/Ezeagu Fed. Constituency(1No), Dkd(10Nos), Wra(5N0S), Ughelli North/Ughelli South/Udu Fed. Constituency(1No), Mangu/ Bokkos Fed. Constituency(1No), Arewa/Dandi Fed. Constituency(1No), Ikwuano/Umuahia Ns Fed. Constituency(1No), Funtua/Dandume Fed. Constituncy(1No), And Dawakin Tofa/Rimin-Gado/Tofa Fed. Constituency(1No). Rogo/Karaye Federal Constituency (1No.), Gombe South/North Federal Constituency (2Nos), Rano/Bunkure/Kibiya Federal Constituency (1No.), Kiru/Bebeji Federal Constituency (1No)., Chanchaga Federal Constituency (2Nos), Dambatta/Makoda (1No.), Zaria Federal Constituency )1No), Jere Federal Constituency (1No)

Total Project Cost

_

STATE

BORNO...

Not Started
Eyemark

Construction/Renovation And Furnishing Of Blocks Of Classrooms Across Six Geopolitical Zones: Oshodi/Isolo Federal Constituency; Panshin/Kanke/Kanam Federal Constituency; Fence In Government Girl Day Secondary School Bakura, Bakura/Marudun Federal Constituency; Schools In Kano State; Rcm Primary School, Agbaikyor Fiidi; Gwarzo Lga, Kabo/Gwarzo Federal Constituency; Oluku Secondary School, Ovia North-East Lga, Ovia Federal Constituency; Baure Primary School, Bindawa Lga; Bindawa/Mani Federal Constituency; Kudan Lga, Makarfi/Kudan Federal Constuituency; Nok And Duya, Zango Kataf/Jaba Federal Constituency; Bende Federal Constituency, Katsina Central Federal Constituency

Total Project Cost

_

STATE

EDO...

Not Started
Eyemark

Construction/Renovation And Furnishing Of Blocks Of Classrooms Across Six Geopolitical Zones: Oshodi/Isolo Federal Constituency; Panshin/Kanke/Kanam Federal Constituency; Fence In Government Girl Day Secondary School Bakura, Bakura/Marudun Federal Constituency; Schools In Kano State; Rcm Primary School, Agbaikyor Fiidi; Gwarzo Lga, Kabo/Gwarzo Federal Constituency; Oluku Secondary School, Ovia North-East Lga, Ovia Federal Constituency; Baure Primary School, Bindawa Lga; Bindawa/Mani Federal Constituency; Kudan Lga, Makarfi/Kudan Federal Constuituency; Nok And Duya, Zango Kataf/Jaba Federal Constituency; Bende Federal Constituency, Katsina Central Federal Constituency

Total Project Cost

_

STATE

EDO...

Not Started
Eyemark

Construction Of 4Nos. 3000 Capacity Maximum Security Custodial Centres In Ilesha, Osun State, Jos, Plateau State, Gombe, Gombe State And Umuahia, Abia State.

Total Project Cost

_

STATE

GOMBE...

Not Started
Eyemark

Construction Of 30Nos Blocks Of 2 Classrooms At Bindawa/Mani Fed. Constituency(1No), Lavun/Mokwa/Edati Fed. Constituency(1No), Shira/Giade Fed. Constituency(1No), Darazo/Ganjuwa Fed. Constituency(2Nos), Ikenne/Sagamu/Remo North Fed. Constituency(1No), Lafia/Obi Fed. Constituency(1No), Wurno/Rabah Fed. Constituency(1No), Kaduna North Fed. Constituency(2Nos), Dkd(7Nos), Wra(3Nos), Mbaitoli Ikeduru Fed. Constituency(2No), Udi/Ezeagu Fed. Constituency(1No), Awe/Doma/Keana Fed. Constituency(1No), Ughelli North/Ughelli South/Udu Fed. Constituency(1No), Mangu/ Bokkos Fed. Constituency(1No), Arewa/Dandi Fed. Constituency(1No), Dawaki Tofa/Rimin-Gado/Tofa Fed. Constituency(1No), Funtua/Dandume Fed. Constituency(1No), And Shinkafi/Zurmi Fed. Constituency(2Nos)

Total Project Cost

_

STATE

OGUN...

Not Started
Eyemark

Construction Of Jarmai-Bashar-Zurak-Andame Road In Karim Lamido Lga, Plateau And Taraba States C/No.6758

Total Project Cost

_

STATE

TARABA...

Ongoing
Eyemark

Rehabilitation Of Digare-Mansir (Bauchi State)-Garga-Furyam Kasuwa-Jamai (Plateau State)

Total Project Cost

_

STATE

BAUCHI...

Not Started
Eyemark

Construction Of Takalafiya; Jigawan Audu-Yal; & Other Selected Rural Roads In Plateau State. (Ongoing)

Total Project Cost

_

STATE

PLATEAU

Not Started
Eyemark

Construction Of 85M Takalafiya Bridge In Plateau State

Total Project Cost

_

STATE

PLATEAU

Ongoing
Eyemark

Construction Of Panyam-Bokkos-Wamba Road, Wamba-Wanse Road In Nasarawa State C/No.6258

Total Project Cost

_

STATE

NASARAWA...

Not Started
Eyemark

Construction Of 25Nos Blocks Of 3 Classrooms At Boki/Ikom Federal Constcituency(1No), Bama/Ngala/Kala Balge Federal Constituency(1No), Zaki Federal Constituency(1No), Katsina Central Federal Constituency(1No), Gwaram Federal Constituency(1No), Kankia,Kusada,Ingawa Federal Constituency(1No), Owerri North And Owerri West Federal Constituency(2No), Barkin-Ladi/Riyom Federal Constituency(1No), Birniwa/Guri/Kirikasamma Federal Constituency(2No), Kabba-Bunu/Ijumu Federalconstituency(1No), Wudil/Garko Federal Constituency(2No), Tsanyawa/Kunchi Federal Constituency(2No), Kabo/Gwarzo Federal Constituency(2No), Shanono/Bagwai Federal Constituency(1No), Chanchaga Federal Constituency(1No), Lavun/Makwa/Edati Federal Constituency(1No), Bogoro/Dass/Tafawa Balewa Federal Constituency(4Nos) And Pankshin/Kanke/Kanam Federal Constituency(1No).

Total Project Cost

_

STATE

BAUCHI...

Not Started
Eyemark

Construction Of 32Nos Blocks Of 3 Classrooms At Calabar Municipal/ Odukpani Fed. Constituency(3Nos), Lavun/Mokwa/Edati Fed. Constituency(1No), Orumba N/S Fed. Constituency(1No), Udi/Ezeagu Fed. Constituency(1No), Dkd(10Nos), Wra(5N0S), Ughelli North/Ughelli South/Udu Fed. Constituency(1No), Mangu/ Bokkos Fed. Constituency(1No), Arewa/Dandi Fed. Constituency(1No), Ikwuano/Umuahia Ns Fed. Constituency(1No), Funtua/Dandume Fed. Constituncy(1No), And Dawakin Tofa/Rimin-Gado/Tofa Fed. Constituency(1No). Rogo/Karaye Federal Constituency (1No.), Gombe South/North Federal Constituency (2Nos), Rano/Bunkure/Kibiya Federal Constituency (1No.), Kiru/Bebeji Federal Constituency (1No)., Chanchaga Federal Constituency (2Nos), Dambatta/Makoda (1No.), Zaria Federal Constituency )1No), Jere Federal Constituency (1No)

Total Project Cost

_

STATE

BORNO...

Ongoing
Eyemark

Completion Of Police Station Building, Sagbama. Bayelsa State; Reconstruction Of The Okija Divisional Police Station, Ihiala Federal Constituency Anambra State; Police Station In Mangu Town, Mangu Lga Plateau State; Construction Of Police Station(Administrative/Residential Buildings), Ibot Okpong Town,Andoni; Construction Of Police Barrack In Bena, Denko Wasagu Local Govt.Kebbi; Renovation And Fencing Of Police Station In Tangaza, Construction Equipment Office For Police Out Post In Ruwawuri,Renovation And Fencing Of Police Station In Gudu.Sokoto State; Renovation Of Police Post In Obubra Junction, Obubra Lga Cross River State; Building Of A Police Station In Ifira Akoko, Akoko South East Lga Of Ondo State; Building Of A Police Station At Adiga Okpoga Community, Okpokwu Lga Benue State; Renovation, Equipping And Building More Police Stations And Posts In Obarikom And Aligwu Communities, Ogba, Egbema, Ndoni, Ahoada West Constituency Of Rivers State; Construction Of Modern Police Stat

Total Project Cost

_

STATE

ANAMBRA...

Not Started
Eyemark

Provision Of Special Energy Grid Solutions In Selected Locations In Gindiri , Plateau State

Total Project Cost

_

STATE

PLATEAU

Not Started
Eyemark

Supply And Installation Of 3-In-1 Solar Street Lights In Selected Areas Of Otukpo/Ohimini Federal Constituency, Ajaokuta Federal Constituency, Lavun/Mokwa/Edati Federal Constituency, Adavi/Okehi Federal Constituency And Pankshin/Kanke/Kanam Federal …

Total Project Cost

_

STATE

BENUE...

Not Started
Eyemark

Supply And Installation Of 3-In-1 Solar Street Lights In Selected Areas Of Otukpo/Ohimini Federal Constituency, Ajaokuta Federal Constituency, Lavun/Mokwa/Edati Federal Constituency, Adavi/Okehi Federal Constituency And Pankshin/Kanke/Kanam Federal …

Total Project Cost

_

STATE

BENUE...

Ongoing
Eyemark

Construction Of Mangu Dam

Total Project Cost

_

STATE

PLATEAU

Ongoing
Eyemark

General Maintenance Of Pankshin-Ballang-Nyelleng-Sara-Lere-Gindiri Road In Plateau State

Total Project Cost

_

STATE

KADUNA...

Ongoing
Eyemark

Rehabilitation Of Digare-Mansir (Bauchi State)-Garga-Furyam Kasuwa-Jamai (Plateau State)

Total Project Cost

_

STATE

BAUCHI...

Not Started
Eyemark

Makeri-Pankshin Power Transmission Line Rehabilitation Phase 2

Total Project Cost

_

STATE

PLATEAU

Ongoing
Eyemark

Emergency Repairs And Maintenance Of The Following Highway Projects - (1) Emergency Maintenance Of Madalla - Sulleja (Maje) Junction Road From (Ch0+000+Ch9+750), (2) Emergency Repairs Of Washout At Ch.39+860 Along Abuja-Lokoja Road (Section Ii), (3) Emergency Repairs On Lafia-Shendam Road Ch.39)-Ch.53+300 In Nasarawa State) Phase), (4) Emergency Repairs Of Failed Sections Between Ch.75+700+Ch.77+200 = 1,599M Along Minna-Zungeru-Tegina Road In Niger State, (5) Reinstatement Of Failed Carriageway Section At Baban Gada Bridge Approach Roads (Ch.40+500) Within Ch39+500-Ch41+500=2,000M Along Minna-Zungeru Tegina Road In Niger State, (6) Emergency Repairs Of Collapsed Double Pipe Culvert (Ch.28+000) Along Shendam-Kurgwi Road In Plateau State, (7) Special Repairs Of Ugboju-Onyangede Road Section Of Ugboju-Ankpa Road In Kogi State, (8) Emergency Repairs Of Jos-Gimi (A3/A70) (Kaduna State Border) Road In Plateau State Section 1, (9) Emergency Repairs At Km 22 +100 – Km 57+100 Along Makurdi – A…

Total Project Cost

_

STATE

BENUE...

Not Started
Eyemark

Makeri-Pankshin Power Transmission Line Rehabilitation

Total Project Cost

_

STATE

PLATEAU

Not Started
Eyemark

Construction Of 25Nos Blocks Of 3 Classrooms At Boki/Ikom Federal Constcituency(1No), Bama/Ngala/Kala Balge Federal Constituency(1No), Zaki Federal Constituency(1No), Katsina Central Federal Constituency(1No), Gwaram Federal Constituency(1No), Kankia,Kusada,Ingawa Federal Constituency(1No), Owerri North And Owerri West Federal Constituency(2No), Barkin-Ladi/Riyom Federal Constituency(1No), Birniwa/Guri/Kirikasamma Federal Constituency(2No), Kabba-Bunu/Ijumu Federalconstituency(1No), Wudil/Garko Federal Constituency(2No), Tsanyawa/Kunchi Federal Constituency(2No), Kabo/Gwarzo Federal Constituency(2No), Shanono/Bagwai Federal Constituency(1No), Chanchaga Federal Constituency(1No), Lavun/Makwa/Edati Federal Constituency(1No), Bogoro/Dass/Tafawa Balewa Federal Constituency(4Nos) And Pankshin/Kanke/Kanam Federal Constituency(1No).

Total Project Cost

_

STATE

BAUCHI...

Not Started
Eyemark

Construction Of 25Nos Blocks Of 3 Classrooms At Boki/Ikom Federal Constcituency(1No), Bama/Ngala/Kala Balge Federal Constituency(1No), Zaki Federal Constituency(1No), Katsina Central Federal Constituency(1No), Gwaram Federal Constituency(1No), Kankia,Kusada,Ingawa Federal Constituency(1No), Owerri North And Owerri West Federal Constituency(2No), Barkin-Ladi/Riyom Federal Constituency(1No), Birniwa/Guri/Kirikasamma Federal Constituency(2No), Kabba-Bunu/Ijumu Federalconstituency(1No), Wudil/Garko Federal Constituency(2No), Tsanyawa/Kunchi Federal Constituency(2No), Kabo/Gwarzo Federal Constituency(2No), Shanono/Bagwai Federal Constituency(1No), Chanchaga Federal Constituency(1No), Lavun/Makwa/Edati Federal Constituency(1No), Bogoro/Dass/Tafawa Balewa Federal Constituency(4Nos) And Pankshin/Kanke/Kanam Federal Constituency(1No).

Total Project Cost

_

STATE

BAUCHI...

Ongoing
Eyemark

Rehabilitation Of Jos-Jengre-Saminaka Road (Jos-Jengre Road) Section) I Phase I In Plateau State (Km 0+000-Km25+500

Total Project Cost

_

STATE

PLATEAU

Not Started
Eyemark

Construction Of 25Nos Blocks Of 3 Classrooms At Boki/Ikom Federal Constcituency(1No), Bama/Ngala/Kala Balge Federal Constituency(1No), Zaki Federal Constituency(1No), Katsina Central Federal Constituency(1No), Gwaram Federal Constituency(1No), Kankia,Kusada,Ingawa Federal Constituency(1No), Owerri North And Owerri West Federal Constituency(2No), Barkin-Ladi/Riyom Federal Constituency(1No), Birniwa/Guri/Kirikasamma Federal Constituency(2No), Kabba-Bunu/Ijumu Federalconstituency(1No), Wudil/Garko Federal Constituency(2No), Tsanyawa/Kunchi Federal Constituency(2No), Kabo/Gwarzo Federal Constituency(2No), Shanono/Bagwai Federal Constituency(1No), Chanchaga Federal Constituency(1No), Lavun/Makwa/Edati Federal Constituency(1No), Bogoro/Dass/Tafawa Balewa Federal Constituency(4Nos) And Pankshin/Kanke/Kanam Federal Constituency(1No).

Total Project Cost

_

STATE

BAUCHI...

Not Started
Eyemark

Completion Of Construction Of 85M Takalafiya Bridge In Plateau State (Ongoing)

Total Project Cost

_

STATE

PLATEAU

Not Started
Eyemark

Establishment Of New Six (5) Additional Federal Science And Technical Colleges (Fstc) In(Bauchi, Plateau, Sokoto, Enugu & Cross-River State) @ N300M Each, Assessment Of Sites Of The New Fstcs N25M.

Total Project Cost

_

STATE

BAUCHI...

Not Started
Eyemark

Supply And Installation Of 3-In-1 Solar Street Lights In Selected Areas Of Otukpo/Ohimini Federal Constituency, Ajaokuta Federal Constituency, Lavun/Mokwa/Edati Federal Constituency, Adavi/Okehi Federal Constituency And Pankshin/Kanke/Kanam Federal …

Total Project Cost

_

STATE

BENUE...

Not Started
Eyemark

Construction Of 30Nos Blocks Of 2 Classrooms At Bindawa/Mani Fed. Constituency(1No), Lavun/Mokwa/Edati Fed. Constituency(1No), Shira/Giade Fed. Constituency(1No), Darazo/Ganjuwa Fed. Constituency(2Nos), Ikenne/Sagamu/Remo North Fed. Constituency(1No), Lafia/Obi Fed. Constituency(1No), Wurno/Rabah Fed. Constituency(1No), Kaduna North Fed. Constituency(2Nos), Dkd(7Nos), Wra(3Nos), Mbaitoli Ikeduru Fed. Constituency(2No), Udi/Ezeagu Fed. Constituency(1No), Awe/Doma/Keana Fed. Constituency(1No), Ughelli North/Ughelli South/Udu Fed. Constituency(1No), Mangu/ Bokkos Fed. Constituency(1No), Arewa/Dandi Fed. Constituency(1No), Dawaki Tofa/Rimin-Gado/Tofa Fed. Constituency(1No), Funtua/Dandume Fed. Constituency(1No), And Shinkafi/Zurmi Fed. Constituency(2Nos)

Total Project Cost

_

STATE

OGUN...

Not Started
Eyemark

Provision And Installation Of Solar Powered Boreholes And Street Lights In Selected Township Communities In Constituencies Across The Following States: Edo, Katsina, Imo,Benue, Kogi, Jigawa, Fct, Nasarawa, Kano, Plateau And Ondo States

Total Project Cost

_

STATE

NASARAWA...

Ongoing
Eyemark

Rehabilitation Of Tumu-Pindiga-Kashere (Gombe State)-Futuk-Yalo (Bauchi State)-Bashar-Dengi (Plateau State Road C/No.6214

Total Project Cost

_

STATE

BAUCHI...

Ongoing
Eyemark

Procurement Of 331,000 Cylinders With Burners (6Kg), For Distribution To Women In 15 States As Follows: Gombe, Bauchi, Kwara, Plateau, Niger, Sokoto, Kebbi, Jigawa, Oyo, Osun, Enugu, Imo, Delta, Bayelsa And Akwa-Ibom.

Total Project Cost

_

STATE

BAUCHI...

Ongoing
Eyemark

Construction Of Jarmai-Bashar-Zurak-Andame Road In Karim Lamido Lga, Plateau And Taraba States

Total Project Cost

_

STATE

TARABA...

Not Started
Eyemark

Establishment Of New Ten (10) Additional Federal Science And Technical Colleges (Fstc) In(Kwara, Zamfara, Anambra, Gombe, Delta Bauchi, Plateau, Sokoto, Enugu And Cross Rivers State) Each, Assessment Of Sites Of The New Fstcs.

Total Project Cost

_

STATE

BAUCHI...

Not Started
Eyemark

Construction Of Langtang-Wase Bridge

Total Project Cost

_

STATE

PLATEAU